2024 Jan – Energy Audit of Four Seasons Beijing
AEM appointed to design and manage the upgrade of existing Chiller Plant BMS (system and control logic) for Automatic operation.
2024 Jan – Energy Audit of Four Seasons Beijing
AEM appointed to design and manage the upgrade of existing Chiller Plant BMS (system and control logic) for Automatic operation.