News
2025 May - HKJC Shatin Club House Renovation T&C consultant

Provide T&C Consultancy Service for HKJC 2/F Shatin Club House Renovation Project.
2025 Apr - Cathay Pacific Lounge The Bridge Resumption Project

AEM was appointed to carry out the Supporting Consultancy Services - The Bridge Lounge (Building Services Quality Control)
2025 Mar - Tak Hing Street Project - CxA - T&C

AEM appointed as the Commissioning Authority (BEAM Plus New Building V2.0) for Redevelopment at No.7-8 Tak Hing Street.
2025 Jan - Water and Waste Audit of Four Seasons Hotel Shenzhen

AEM will conduct water and waste audits for the Shenzhen Four Seasons Hotel, adhering to:
Water Audit: BOMA Best standards to improve water efficiency. Waste Audit: Hotel Waste Measurement Methodology V1.0 to Optimize Waste Management.
2024 Nov - RCx of Temple Mall South

AEM was appointed to carry out Retro- Commissioning on chilled water balancing work and performance review of temple Mall South.
2024 Nov - Ma On Shan Centre RCx Project

AEM was appointed to carry out the Retro-Commissioning Services of Ma On Shan Centre. The result: Achieved over 10% savings for 4 consecutive months.
2024 Nov - Concord Hotel Chiller plant replacement

Provide a system design and project management consultancy, and represent China Construction Bank (Asia) to monitor the chiller replacement and system commissioning.
2024 Oct - HAECO RCx Project

AEM appointed to conduct retro-commissioning for the chilled water distribution and air distribution systems of Hangar 1 - 3.

