News

2025

2025 Jun - Central Kowloon Route Tunnel hot smoke test

2025-6 Central Kowloon Route Tunnel hot smoke test

2025 May - HKJC Shatin Club House Renovation T&C consultant

2025-5 HKJC Shatin Club House Recovation T&C contsultant

Provide T&C Consultancy Service for HKJC 2/F Shatin Club House Renovation Project.

2025 Apr - Cathay Pacific Lounge The Bridge Resumption Project

2025-4 Cathay Pacific Lounge The Bridge Resumption Project

AEM was appointed to carry out the Supporting Consultancy Services - The Bridge Lounge (Building Services Quality Control)

2025 Mar - Tak Hing Street Project - CxA - T&C

2025-3 Tak Hing Street Project – ICA – T&C

AEM appointed as the Commissioning Authority (BEAM Plus New Building V2.0) for Redevelopment at No.7-8 Tak Hing Street.

2025 Feb - Hong Kong Airport Terminal 2 Hot Smoke Test

2025-2 T2 Hot Smoke Test

2025 Jan - Water and Waste Audit of Four Seasons Hotel Shenzhen

2025-1 Water and Waste Audit of ShenZhen Four Seasons

AEM will conduct water and waste audits for the Shenzhen Four Seasons Hotel, adhering to:

Water Audit: BOMA Best standards to improve water efficiency. Waste Audit: Hotel Waste Measurement Methodology V1.0 to Optimize Waste Management.

2024

2024 Nov - RCx of Temple Mall South

2024-11 RCx of Temple Mall South

AEM was appointed to carry out Retro- Commissioning on chilled water balancing work and performance review of temple Mall South.

2024 Nov - Ma On Shan Centre RCx Project

2024-11 Ma On Shan Centre RCx Project

AEM was appointed to carry out the Retro-Commissioning Services of Ma On Shan Centre. The result: Achieved over 10% savings for 4 consecutive months.

2024 Nov - Concord Hotel Chiller plant replacement

2024-11 Concord Hotel Chiller replacement

Provide a system design and project management consultancy, and represent China Construction Bank (Asia) to monitor the chiller replacement and system commissioning.

2024 Oct - HAECO RCx Project

2024-10 HAECO RCx Project

AEM appointed to conduct retro-commissioning for the chilled water distribution and air distribution systems of Hangar 1 - 3.