2023 Jul – Energy Audit of Mandarin Oriental Pudong, Shanghai

2024 Feb – Energy Audit of K11 ARTUS

2024 Jul – Energy Audit of Four Seasons Jakarta

2023 Jan – Energy Audit of Intel

2022 Dec – Energy Audit of Hyatt Hotel Bangkok

2023 Sep – Energy Audit of Hong Kong Hyatt Hotel Group

2023 Mar – Energy Audit of Four Seasons Hotel Hong Kong

2024 Sep – Electrical and Drainage Condition Survey (China Construction Bank Centre)

Assessment of the main plant, pipework, low voltage switchboards (LVSB), and floor drain condition in the existing building.

2024 Feb – DHL Hot Smoke Test

2024 Nov – Concord Hotel Chiller plant replacement

Provide a system design and project management consultancy, and represent China Construction Bank (Asia) to monitor the chiller replacement and system commissioning.