2024 Feb – Energy Audit of K11 ARTUS
2024 Jul – Energy Audit of Four Seasons Jakarta
2023 Jan – Energy Audit of Intel
2022 Dec – Energy Audit of Hyatt Hotel Bangkok
2023 Sep – Energy Audit of Hong Kong Hyatt Hotel Group
2023 Mar – Energy Audit of Four Seasons Hotel Hong Kong
2024 Sep – Electrical and Drainage Condition Survey (China Construction Bank Centre)
Assessment of the main plant, pipework, low voltage switchboards (LVSB), and floor drain condition in the existing building.
2024 Feb – DHL Hot Smoke Test
2024 Nov – Concord Hotel Chiller plant replacement
Provide a system design and project management consultancy, and represent China Construction Bank (Asia) to monitor the chiller replacement and system commissioning.